WESTCOR THERMAL REPORT

Quality Control

  • Subcontractor: Westcor Thermal Inc.
  • Location
  • Materials Westcor General Contractor Actions
         
    There are no Entries.

    Maximum number of entries reached.

    • Installation
    • Westcor
    • 1. Examination – Check and accept installation area and job site conditions before commencing the work
    • 2. Safety – Proper control zones taped off plus proper machine safety controls, etc.
    • 3. Surface protection (poly work)
    • 4. Thickness Checks
    • 5. Overall quality of finish
    • 6. Proper housekeeping once area is complete
  • Reviewed By…
  • Note: Sign off is for quality control purposes only and does not relieve the subcontractor of their obligation to obtain compliance with specified requirements and contractual responsibilities.
    • Subcontractor
    • General Contractor
  • Drop files here or
    Max. file size: 512 MB.
      You can Upload Multiple images
    Westcor Thermal Inc

    19272 96 Ave Unit 16 Surrey, BC V4N 4C1
    604-547-0979
    Admin@WestcorThermal.com

    Hours of Operation

    Monday – Friday: 7:30 AM – 4:30 PM